ESS LLC | Buhl, Idaho

STOP CUTTING.

START CLICKING.

ESS SmartBuild systems eliminate job site measuring, cutting, and waste with prefab steel framing solutions.

3-5

DAYS

Frame a 2,000 SF House

2-3

PEOPLE

General Laborers Needed

2

TOOLS

Clamp + Screw Gun

<2%

WASTE

Pre-cut to Exact Specs

ESS Steely Stairs
ESS Steely Stairs
ESS SmartBuild Panel
ESS Steely Shed

The Cost Nobody Talks About

The Hidden $3.70/SF

Construction studies show only 49% of paid framing labor is actual assembly. The other 51% is plan-reading, layout, measuring, cutting, and material handling.

CREW MEMBERNON-ASSEMBLY TIMEWHAT THEY'RE DOING INSTEAD
Lead / Foreman~70% (5.5 hrs)Reading plans, layout, chalk lines, checking square & plumb
Cut Man~90% (7.0 hrs) Measuring, marking, cutting every single piece
Nailer #1~30% (2.5 hrs) Walking for material, waiting on cuts, staging
Nailer #2~30% (2.5 hrs) Walking for material, waiting on cuts, staging
TOTAL~30% (2.5 hrs)More than half your payroll produces zero walls

Traditional Daily Cost

$1,120 / day

4-man crew at $35/hr average

Wasted on Non-Assembly
$616 / day
55% spent on prep, not building
Over 12 Working Days That’s
$7400
$3.70 per SF you’re paying for work that doesn’t put up a single wall
SmartBuild eliminates virtually 100% of that cost.

HEAD TO HEAD

Traditional Framing vs SmartBuild

CATEGORY
TRADITIONAL
SMARTBUILD
Framing Time (2,000 SF)
2-3 Weeks
3-5 Days
Crew Size
4-5 Skilled Framers
2-3 General Laborers
Skill Level Required
Journeyman+
Basic Assembly
Material Waste
10-15%
Under 2%
On-Site Cutting
Every Piece
Zero
Hidden Prep Labor
$3.70/SF ($7,400)
$0
Daily Setup Time
30-60 Minutes
~5 Minutes
Tools Required
12+ (saws, guns, etc.)
2 (Clamp + Screw Gun)
Fire / Pest / Moisture
Vulnerable
Immune
Dimensional Stability
Warps, Crowns, Shrinks
Straight Forever
Price Volatility
High (45% Tariffs)
Stable (Manufactured)
HOW IT WORKS

From Plans to Framed

“If you can put together something from IKEA, you have more skill than is needed to assemble ESS SmartBuild systems.”

Send Us Your Plans

Architectural drawings, structural plans, or pdf files. We’ll take them from there.

We Engineer Everything

Our in-house team creates precise cut lists with exact dimensions.

Pre-Cut & Indexed

Every piece cut to spec with snap-together labeling and indexing marks.

Labeled & Packaged

All pieces labeled (Wall A1, Stud 1, etc.) and organized by sequence.

Delivered to Your Site

Via our network of distributors and suppliers.

Snap, Clamp, Screw

Your crew assembles with just a clamp and screw gun. No cutting required.

Hidden Prep Labor Eliminated

$7,400

$3.70/SF in plan-reading, layout, measuring, cutting, and material handling.

Labor Savings

$7,800–$11,200

Cutting framing time from 15 days to 5 days with a smaller crew (based on 4-man crew at $35/hr avg).
Waste Savings

$2,800–$4,200

Eliminating 10–15% material waste down to under 2% pre-cut precision.
Combined Real Savings
$18,000–$22,800
Per 2,000 SF house

Hidden Prep Labor Eliminated

$18,500–$37,000

$3.70/SF across 5,000–10,000 SF commercial builds, layout, measuring, and cutting costs vanish.
Labor Savings

$28,000–$56,000

Reduce framing crews by 40–60% and compress schedules from weeks to days on commercial timelines.
Waste Savings

$8,400–$21,000

Commercial-scale waste reduction from 10–15% down to under 2% on higher material volumes.
Combined Real Savings
$54,900–$114,000
Per 5,000–10,000 SF building

Hidden Prep Labor Eliminated

$14,800–$29,600

$3.70/SF across 4,000–8,000 SF multi-family units, repetitive layouts amplify savings per building.
Labor Savings

$19,500–$44,800

Identical unit designs mean faster learning curves so crews hit peak speed by unit 2 or 3.
Waste Savings

$5,600–$16,800

Repeating floor plans maximize material nesting efficiency, pushing waste well below 2%.
Combined Real Savings
$39,900–$91,200
Per 4,000–8,000 SF building
Your Numbers
CALCULATE YOUR PROJECT SAVINGS

Enter your project details and choose Kits or Panels. See exactly how much you save.

Heated Square Footage
Your Framing Labor Cost ($/SF)
What You’re Losing Today
Wasted Prep Labor (55%)
$13,200
$6.60/SF going to non-assembly work
Material Waste (12.5% avg)
$3,500
Avg material waste in the dumpster
Dumpster Fees
$1,500
2–3 hauls per house
Total Savings With SmartBuild
$18,200
$9.10/SF in hidden costs eliminated
Setup Fee (one-time per plan)
$3,000
$1.50/SF — waived on repeat builds
Kit Material Premium
$5,500
+$2.75/SF avg over traditional
Net Savings (First Build)
$9,700
Repeat builds save even more